Browse
Despite the more complicated drawings, the designs start to show signs of paring back on the 1822 scheme, such as the reduction in ornament, changes to the tower, and roof structure, which was in line with the reductions of expenses insisted on by the Church Commissioners, after Soane's estimate for the 1822 scheme came in at £17,800, which was £1,800 over-budget.
The bulk of the drawings for 1823 were executed from January to June. Many of these may have been shown to the Commissioners and Newington Trustees as the new design was approved on 6 May and the first stone of the church laid on 2 June. More detailed designs for the tower, and other specific details were ongoing throughout the remainder of the year.
Sir John Soane's collection includes some 30,000 architectural, design and topographical drawings which is a very important resource for scholars worldwide. His was the first architect’s collection to attempt to preserve the best in design for the architectural profession in the future, and it did so by assembling as exemplars surviving drawings by great Renaissance masters and by the leading architects in Britain in the 17th and 18th centuries and his near contemporaries such as Sir William Chambers, Robert Adam and George Dance the Younger. These drawings sit side by side with 9,000 drawings in Soane’s own hand or those of the pupils in his office, covering his early work as a student, his time in Italy and the drawings produced in the course of his architectural practice from 1780 until the 1830s.
Browse (via the vertical menu to the left) and search results for Drawings include a mixture of Concise catalogue records – drawn from an outline list of the collection – and fuller records where drawings have been catalogued in more detail (an ongoing process).
Contents of Designs and memorandum for the 1823 scheme, St Peter's, Walworth, London, 1823 (14)
- [18] Design for the foundations, St Peter's, Walworth, London, January 1823
- [19] Design for the heating system, St Peter's, Walworth, London, c.January-May 1823
- [20] Text proposal and estimate for stove heating, St Peter's, Walworth, London, January-May 1823
- [21] Design for the vault, St Peter's, Walworth, London, May 1823
- [22] Design for the ground floor, St Peter's, Walworth, London, 1823
- [23] Design for the galleries, St Peter's, Walworth, London, c.1823
- [24] Design for the stone foundation base of St Peter’s Church, Walworth, London (?), 3 September 1823
- [25] Design for the principal (west) front, St Peter's, Walworth, London, January 1823
- [26] Design for the rear (east) front, St Peter's, Walworth, London, January 1823
- [27] Design for the south front, St Peter's, Walworth, London, June 1823
- [28] Design for the interior, St Peter's, Walworth, London, January 1823
- [29] Design for the interior, St Peter's, Walworth, London, c.January-June 1823
- [30] Design for the interior, St Peter's, Walworth, London, January-June 1823
- [31] Design for the interior, St Peter's, Walworth, London, January-June 1823