Purpose
Designs and memorandum for the 1823 scheme, St Peter's, Walworth, London, 1823 (14)
Notes
This series of drawings was probably started in December 1822 when the Soane Office Day Books record work resuming on designs, but were not finished until 1823. The drawings, especially the sections become more detailed and thorough, and this group includes the only plan produced for the vault, and for the heating system.
Despite the more complicated drawings, the designs start to show signs of paring back on the 1822 scheme, such as the reduction in ornament, changes to the tower, and roof structure, which was in line with the reductions of expenses insisted on by the Church Commissioners, after Soane's estimate for the 1822 scheme came in at £17,800, which was £1,800 over-budget.
The bulk of the drawings for 1823 were executed from January to June. Many of these may have been shown to the Commissioners and Newington Trustees as the new design was approved on 6 May and the first stone of the church laid on 2 June. More detailed designs for the tower, and other specific details were ongoing throughout the remainder of the year.
Despite the more complicated drawings, the designs start to show signs of paring back on the 1822 scheme, such as the reduction in ornament, changes to the tower, and roof structure, which was in line with the reductions of expenses insisted on by the Church Commissioners, after Soane's estimate for the 1822 scheme came in at £17,800, which was £1,800 over-budget.
The bulk of the drawings for 1823 were executed from January to June. Many of these may have been shown to the Commissioners and Newington Trustees as the new design was approved on 6 May and the first stone of the church laid on 2 June. More detailed designs for the tower, and other specific details were ongoing throughout the remainder of the year.
Level
Group
If you have any further information about this object, please contact us: drawings@soane.org.uk
Contents of Designs and memorandum for the 1823 scheme, St Peter's, Walworth, London, 1823 (14)
- [18] Design for the foundations, St Peter's, Walworth, London, January 1823
- [19] Design for the heating system, St Peter's, Walworth, London, c.January-May 1823
- [20] Text proposal and estimate for stove heating, St Peter's, Walworth, London, January-May 1823
- [21] Design for the vault, St Peter's, Walworth, London, May 1823
- [22] Design for the ground floor, St Peter's, Walworth, London, 1823
- [23] Design for the galleries, St Peter's, Walworth, London, c.1823
- [24] Design for the stone foundation base of St Peter’s Church, Walworth, London (?), 3 September 1823
- [25] Design for the principal (west) front, St Peter's, Walworth, London, January 1823
- [26] Design for the rear (east) front, St Peter's, Walworth, London, January 1823
- [27] Design for the south front, St Peter's, Walworth, London, June 1823
- [28] Design for the interior, St Peter's, Walworth, London, January 1823
- [29] Design for the interior, St Peter's, Walworth, London, c.January-June 1823
- [30] Design for the interior, St Peter's, Walworth, London, January-June 1823
- [31] Design for the interior, St Peter's, Walworth, London, January-June 1823