Explore Collections Explore The Collections
You are here: CollectionsOnline  /  Unfinished preliminary designs and finished drawings for the ceiling and walls of the first drawing room, 1780-85, unexecuted (4)

Browse

Purpose

Unfinished preliminary designs and finished drawings for the ceiling and walls of the first drawing room, 1780-85, unexecuted (4)

Notes

Adam designed three adjacent drawing rooms for the principal (first) floor of Cumberland House. The first drawing room was to be in the north-east corner of the house, the second in the south-east corner, and the third was in the centre of the south front. None of the drawing rooms were executed.

Level

Group

Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation

If you have any further information about this object, please contact us: drawings@soane.org.uk

Contents of Unfinished preliminary designs and finished drawings for the ceiling and walls of the first drawing room, 1780-85, unexecuted (4)