Explore Collections

You are here:
CollectionsOnline
/
Alternative preliminary design and finished drawing for a covered bridge, ND, not known to have been executed (2)
Browse
Purpose
Alternative preliminary design and finished drawing for a covered bridge, ND, not known to have been executed (2)
Notes
See scheme notes.
Level
Group
Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation
If you have any further information about this object, please contact us: drawings@soane.org.uk
Contents of Alternative preliminary design and finished drawing for a covered bridge, ND, not known to have been executed (2)
- [1] Preliminary design for a covered bridge, ND, not known to have been executed
- [2] Finished drawing for a covered bridge, ND, not known to have been executed