Explore Collections Explore The Collections
You are here: CollectionsOnline  /  [1] Preliminary design for a covered bridge, ND, not known to have been executed

Browse

  • image SM Adam volume 9/90

Reference number

SM Adam volume 9/90

Purpose

[1] Preliminary design for a covered bridge, ND, not known to have been executed

Aspect

Rough elevation of a bridge of two arches, supported by woodwork, with a trellis balustrade extending along the abutments, and surmounted by a tiled hipped-roof covering supported by paired and triple Doric columns

Scale

not to scale

Signed and dated

  • 1758-94
    ND

Medium and dimensions

Pencil on laid paper (183 x 124)

Hand

Robert Adam

Literature

For a full list of literature references see scheme notes.

Level

Drawing

Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation

If you have any further information about this object, please contact us: drawings@soane.org.uk