Explore Collections

You are here:
CollectionsOnline
/
Designs and finished drawings for a variant of Holy Trinity Church Marylebone, London, March-September 1822 (7)
Browse
Purpose
Designs and finished drawings for a variant of Holy Trinity Church Marylebone, London, March-September 1822 (7)
Notes
After two years, the site of Holy Trinity was finalised. Soane resumed work on the designs for the Church starting in March and continued to September. The plans show consistency until SM 54/1/10 when the rounded entry steps were replaced by straight steps between projections.
Level
Group
If you have any further information about this object, please contact us: drawings@soane.org.uk
Contents of Designs and finished drawings for a variant of Holy Trinity Church Marylebone, London, March-September 1822 (7)
- [29] Design for the ground floor of Holy Trinity Church, Marylebone, March-April 1822
- [30] Finished drawing for the ground floor of Holy Trinity Church, Marylebone, London, datable to March-April 1822
- [31] Design for the ground floor of Holy Trinity Church, Marylebone, April 1822
- [32] Finished drawing for the ground floor of Holy Trinity Church, Marylebone, London, 1822
- [33] Finished drawing for the galleries and ceiling of Holy Trinity Church, Marylebone, 1822
- [34] Finished drawing for the portico and steeple of Holy Trinity Church, Marylebone, 1822