Explore Collections Explore The Collections
You are here: CollectionsOnline  /  [115] Design and preliminary working drawing for the end elevation, and sections, 9 April 1801

Browse

  • image SM 31/2/62

Reference number

SM 31/2/62

Purpose

[115] Design and preliminary working drawing for the end elevation, and sections, 9 April 1801

Aspect

Cross section from the east end of the house

Scale

bar scale of ¼ inch to 1 foot

Inscribed

labelled A Is determined by the center of the Door into the / Eating Room and B by the center of the end front / and A-B and A-C are equal, aa the springing / of these arches / governed by the arch / leading into lobby / of old drawing Room, This opening / in the finishing / to correspond with / the arch into lobby / of old drawing Room, stone, Bond Timber (twice) and some dimensions given

Signed and dated

  • 9 April 1801
    April 9th. 1801

Medium and dimensions

Pen, pencil, sepia and pale red washes on wove paper (681 x 546)

Hand

Soane office

Level

Drawing

Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation

If you have any further information about this object, please contact us: drawings@soane.org.uk