Explore Collections Explore The Collections
You are here: CollectionsOnline  /  [30] Alternative design for a bridge, c1761-68, unexecuted

Browse

  • image SM Adam volume 51/31

Reference number

SM Adam volume 51/31

Purpose

[30] Alternative design for a bridge, c1761-68, unexecuted

Aspect

Unfinished elevation of a bridge set within a landscape of three segmental arches, the central arch being the widest, supporting four piers. The central arch is surmounted by a sculpted centaur, and the outer arches are surmounted by griffon relief panels. There is a parapet of balustrading. The abutments are ornamented with a band of fret

Scale

bar scale of 3/10 inch to 1 foot

Inscribed

Design of a Bridge for The Right Honble The Earl of Shelburne proposed to be built over a Branch of the Great piece of Water at Bowood in Wiltshire and some measurements given

Signed and dated

  • 1761-1768
    date range: 1761-68

Medium and dimensions

Pen, pencil, wash and coloured washes including sepia within a single ruled border on laid paper (1166 x 446)

Hand

Adam office hand, with title inscription in the hand of William Adam

Literature

Bolton, 1922, Volume II, Index p. 4
King, 2001, Volume II, p. 215
For a full list of literature references see scheme notes.

Level

Drawing

Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation

If you have any further information about this object, please contact us: drawings@soane.org.uk