Explore Collections

You are here:
CollectionsOnline
/
[30] Alternative design for a bridge, c1761-68, unexecuted
Browse
Reference number
SM Adam volume 51/31
Purpose
[30] Alternative design for a bridge, c1761-68, unexecuted
Aspect
Unfinished elevation of a bridge set within a landscape of three segmental arches, the central arch being the widest, supporting four piers. The central arch is surmounted by a sculpted centaur, and the outer arches are surmounted by griffon relief panels. There is a parapet of balustrading. The abutments are ornamented with a band of fret
Scale
bar scale of 3/10 inch to 1 foot
Inscribed
Design of a Bridge for The Right Honble The Earl of Shelburne proposed to be built over a Branch of the Great piece of Water at Bowood in Wiltshire and some measurements given
Signed and dated
- 1761-1768
date range: 1761-68
Medium and dimensions
Pen, pencil, wash and coloured washes including sepia within a single ruled border on laid paper (1166 x 446)
Hand
Adam office hand, with title inscription in the hand of William Adam
Literature
Bolton, 1922, Volume II, Index p. 4
King, 2001, Volume II, p. 215
For a full list of literature references see scheme notes.
King, 2001, Volume II, p. 215
For a full list of literature references see scheme notes.
Level
Drawing
Digitisation of the Drawings Collection has been made possible through the generosity of the Leon Levy Foundation
If you have any further information about this object, please contact us: drawings@soane.org.uk